Proposal

Quote ID: 214-50748

Date: 10/8/2021

Type: Exterior

Estimator:

Amirreza Ghavami

+1(604) 346-9758

AmirrezaGH@GoldenBrushesCanada.com

PRICE OVERVIEW

Sub Total

Grand Total:

$6890.0

(Paint and material included)

PREPARATION EXPECTATIONS:

Unless otherwise indicated on the quote, the work includes all labour, materials, paint and equipment required to complete the project, including:

– Removal and replacement of electrical face plates.

– Priming of new, unprimed wood and drywall prior to application of finish coat(s).

– Patching and sanding of minor dents and scratches on walls and ceilings prior to application of finish coat(s).

– Protection of surfaces and objects not being painted with tape, paper, poly and drop sheets, as required.

– Scraping, sanding and filling, as applicable, of any peeling areas to prepare surfaces for painting.

– Broom clean condition at the end of each day and full clean up at the end of the project, including

removal of any garbage, proper disposal of paint and other products, sweeping and vacuuming. Due to plaster repairs, there will likely be settlement of dust particles post-painting. Some dusting may be required by the client following   project completion.

To prepare and paint the interior of your home, including all labour, materials, paint and equipment. Supply and application of a full two coats of top quality paint products will be included with a two year limited warranty.

Your Project

Project Area

INCLUDES

EXCLUDES

NOTES

PRICE

House Trims

  • FASCIA BOARDS/BAND BOARDS
  • WINDOW TRIMS (18 on the second level\13 on the main level)
  • TOP OF POSTS
  • 2 DOORS AND DOOR FRAMES + GARAGE DOOR

  • SIDINGS
  • SOFFITS
  • WINDOWS
  • GUTTERS
  • DOWNSPOUTS
  • STONE

  • 2 COATS OF LATEX SHERWIN WILLIAMS SATIN IRON ORE SW 7069 ON ALL FASCIA BOARDS/BAND BOARDS, WINDOW TRIMS, AND DOORS
  • 2 COATS OF LATEX SHERWIN WILLIAMS SATIN HIGH REFLECTIVE WHITE SW 7757 ON TOP OF THE POSTS

$6110.0 LABOUR

$780.0 PAINT AND MATERIAL

Price

(Paint and material included)

Sub Total

Discount

Total

$6890.0

Payment Received

Balance Owing

Payment Terms

$0.0

$0.0

30% Before Starting The Project The Rest Upon Completion​

To accept proposal and terms of service please sign and date below

Customer Signature:

Customer Signature:

Date:

Date: